BACK
WIND TURBINES - PLEASE QUOTE
If
your company is able to supply wind turbines which satisfy the criteria below
please copy this page into an email
and send it to
carbonoffset@3rdrock.co.uk
Thank you
C.C.O.P.
Request for Quotation
Item:
<REPLACE WITH NAME>
Wind Turbine
Quantity:
<REPLACE WITH QUANTITY
REQUIRED to GENERATE 180 to 200 kW eg 12 x 15kW>
Location: Cornwall, over
5 miles from the coast, exposed NE/SW ridge
Preferred delivery
dates: Half (<REPLACE
WITH NUMBER>) in
July 2007 & Half (<REPLACE
WITH NUMBER>)
October 2007
Purpose: Power supply
directly to small farm with surplus exported to National Grid.
Location at minimal distance to National Grid.
Questions:
1. What support can you
provide for obtaining planning permission
2. Estimate of time
scale from virgin field to power flow
3. Estimate reasonable
life span of turbine, without major rebuild
4. Estimate maintenance
costs for each year during the first 10 years of service
5. Please provide plans
which demonstrate the below ground preparation/support structure
6. Your company's
Estimate of National Grid supply price over the next 10 years
7. Estimate tonnes of
carbon released into the air as a result of manufacturing a
<NAME>
(including raw materials)
8. Estimate tonnes of
carbon released into the air as a result of installation each
<NAME>
Many thanks,
David Gard
CCOP
Cornish Carbon Offset
Project