◄ BACK                                  WIND TURBINES - PLEASE QUOTE                               

If your company is able to supply wind turbines which satisfy the criteria below

please copy this page into an email

and send it to carbonoffset@3rdrock.co.uk

Thank you

C.C.O.P.

 

Request for Quotation
 
Item: <REPLACE WITH NAME> Wind Turbine
Quantity: <REPLACE WITH QUANTITY REQUIRED to GENERATE 180 to 200 kW eg 12 x 15kW>
Location: Cornwall, over 5 miles from the coast, exposed NE/SW ridge
Preferred delivery dates: Half (<REPLACE WITH NUMBER>) in July 2007 & Half (<REPLACE WITH NUMBER>) October 2007
Purpose: Power supply directly to small farm with surplus exported to National Grid.  Location at minimal distance to National Grid.
Reply: eMail carbonoffset@3rdrock.co.uk
 
Questions:
1.  What support can you provide for obtaining planning permission
2. Estimate of time scale from virgin field to power flow
3. Estimate reasonable life span of turbine, without major rebuild
4. Estimate maintenance costs for each year during the first 10 years of service
5. Please provide plans which demonstrate the below ground preparation/support structure
6. Your company's Estimate of National Grid supply price over the next 10 years
7. Estimate tonnes of carbon released into the air as a result of manufacturing a <NAME> (including raw materials)
8. Estimate tonnes of carbon released into the air as a result of installation each <NAME>
 
Many thanks,
 
David Gard
CCOP
Cornish Carbon Offset Project